Specifications intended to prevent divergent interpretations of the terms used on the platform.
Corporate Leasing
What does "active contract" mean?
A leasing contract is considered active when its validity period has not expired and there is no official termination notice recorded in the system. The grace period for overdue payments does not exceed 15 calendar days from the due date.
Energy Audit
What is the margin of error for the reports?
Energy audit reports are based on in-situ measurements and certified calculation models. The maximum allowable deviation from actual consumption is ±5%, provided that the input data is complete and up-to-date.
Preventive Maintenance
What does the maintenance budget cover?
The budget includes the direct costs of scheduled interventions (labor, spare parts, consumable materials), but does not cover emergency repairs caused by unforeseen events (breakdowns, natural phenomena, vandalism).
General Terms
How is the usable area calculated?
The usable area of a commercial space is determined by measuring the interior perimeter, excluding structural walls, columns, and technical areas (access ways, sanitary installations, ventilation).
Invoicing
What does "base rent" include?
The base rent represents the fixed monthly amount established in the contract, without including maintenance fees, utilities, local taxes, or any other additional costs negotiated separately.
Financial Reports
What period does the budget forecast cover?
The budget forecast is generated for the next 12 months, with monthly updates based on actual expenses and inflation indices published by the National Institute of Statistics.